Scheduling
during my schedule process, I believed that there were some aspects that I could have improved on and other aspects I believed to be on top of. For example, during my scheduling process, I believed one of the hardest aspects is creating the pitch and I believed that I was very creatively efficient not wasting a time with coming up with an idea. However, if I was to look at my scheduling from a different perspective there were many flaws to a lot of my decisions. I planned too much for a production that didn't need for a production that did not require that much. But thanks to my client discussions I was able to alter the things we talked about and correct my mistakes. But further, beyond this point, I believe that there were flaws in my scheduling that could have been avoided. My overall effort into perfecting everything should have been much greater in comparison to the idea that I originally composed. A good thing that I came from my pre-production will have to be the fact I did take a lot of things into consideration when curating my schedule. My use of a Gantt chart not only shows I was somewhat careful on how to articulate ourselves when working but also a way to allow me to track progress when working even though I do realize the flaws in my actions I would also say that these steps are all steps that should have happened as this will allow me not to make the same mistakes again when I come to do this in the future.
Planning
compared to how i handled my scheduling i, i believe that overall i made far better decisions in terms of my planning. During my planning stage i was able to analyse and establish many options that i had at hand and then chose what is best for the final product. As well as this i did show the importance of every aspect within my planning stage but with all this being said i do believe i could have done a better job in my panning stage as some of the information that i put forth was rather bare. In my decisions i wrote the pros and cons when came choosing a location when for shooting which ultimately aided my decision. i believe my greatest aspect in my planning stage will have to be my contingency plan as identified and created a solution for what to do if unforeseen situations happened to present themselves forward when working on the production. Nether the less with all thing considered i believed that the planning phase of my work is better than my scheduling, yet things can be touched on an improved on.
Legal and ethical
Out of the three stages of my work i believe that my legal and ethical considerations is the best for many reasons. For each consideration i spoke as to why it is needed and how it would affect the flow of production if we were to fail to comply with each law. i showed evidence of complying to these laws however some evidence was left out (something i cannot do during a real commission) due to certain situations that was out of my control. With that being said i do believe that this was the best aspect to my work but they're many things that i could have done to help this be better
Comments
Post a Comment