Scheduling during my schedule process, I believed that there were some aspects that I could have improved on and other aspects I believed to be on top of. For example, during my scheduling process, I believed one of the hardest aspects is creating the pitch and I believed that I was very creatively efficient not wasting a time with coming up with an idea. However, if I was to look at my scheduling from a different perspective there were many flaws to a lot of my decisions. I planned too much for a production that didn't need for a production that did not require that much. But thanks to my client discussions I was able to alter the things we talked about and correct my mistakes. But further, beyond this point, I believe that there were flaws in my scheduling that could have been avoided. My overall effort into perfecting everything should have been much greater in comparison to the idea that I originally composed. A good thing that I came from my pre-production will have to be the ...